If you’re planning to build or remodel in Los Angeles, you’ve probably heard the term “RTI” thrown around during the permitting process. RTI stands for Ready to Issue—and it’s one of the most important milestones in any development project.

At JDJ Consulting Group, we help clients get through city red tape and reach RTI status faster. Whether you’re an investor trying to break ground on a multifamily development or a property owner planning a renovation, understanding RTI permitting Los Angeles is essential.

In this guide, we’ll explain what RTI means, why it matters, and how you can move your project from plan check to construction with fewer delays and less stress.

Understanding RTI Status: What Does “Ready‑to‑Issue” Really Mean?

Let’s keep it simple. RTI, or Ready-to-Issue, means your building permit is fully approved by all necessary city departments. You’re not just waiting for feedback—you’re ready to pull the permit and start work.

How the City of Los Angeles Defines RTI

In the City of Los Angeles, every permit application goes through several checks by different departments. These might include:

When all these reviews are completed—and you’ve paid your final fees—the city marks your application RTI. You still need to officially “pull” the permit, but no more corrections or documents are required.

Businesswoman discusses with real estate agent, negotiates and signs contract for purchase of house and land. Wills and inheritance.

Key Differences Between “In Review” and “RTI”

Many applicants confuse being in the later stages of plan check with being approved. But unless your file is RTI, you’re not quite there.

Here’s a quick comparison to help clarify:

StatusWhat It Means
In Plan CheckStill under review by at least one department. Corrections or documents may be needed.
Pending ApprovalMost reviews done, but not all. May still need final payment or clearance.
RTI (Ready to Issue)All reviews completed, fees paid. Permit is ready to be issued.

RTI Permitting Process in Los Angeles: Step-by-Step

Now that we’ve defined RTI, let’s walk through how you get there. The process isn’t always simple, especially in Los Angeles, where zoning overlays, fire-prone areas, and housing incentives add layers of complexity. But at JDJ, we specialize in managing those details for you.

Here’s a breakdown of what the RTI permitting process typically looks like:

Step 1: Submit Plans to LADBS for Review

First, your architect or designer submits building plans to the Los Angeles Department of Building and Safety (LADBS). This starts the official plan check process.

  • Digital submission is now the norm (via LADBS Plan Check and Inspection System).

  • Expect your plans to be reviewed by multiple departments—each with its own requirements.

We often recommend having a pre-submittal strategy meeting with JDJ’s team to avoid rejections or lengthy corrections.

Step 2: Secure Departmental Clearances

Once submitted, your plans are routed to departments such as:

  • Zoning and Planning

  • Fire Marshal

  • Public Works (for street, grading, or sewer clearances)

  • Housing or Environmental if required (especially for TOC or ED1 projects)

Each department will either sign off or issue a correction notice. JDJ Consulting handles coordination and response so your plans keep moving forward.

Step 3: Pay Final Permit Fees

After all departments approve your plans, LADBS issues a fee summary. You’ll pay:

  • Permit fees

  • Plan check fees

  • Inspection fees

  • Any outstanding city charges (like linkage fees or transportation impact fees)

Once payment is made and all paperwork is in, your application reaches RTI status.

Why JDJ’s Clients Reach RTI Faster

The difference between waiting months and moving quickly often comes down to preparation. Here’s a snapshot of how we streamline the process:

Typical Permitting TimelineWith JDJ Consulting Support
6–9 months (average for LA)3–5 months (average with JDJ)
Multiple resubmittals & delaysSingle coordinated submittal
No guidance on city requirementsCustomized checklist + follow‑up
Miscommunication between agenciesJDJ coordinates all departments

Our team doesn’t just submit forms—we help you manage the entire permitting journey from concept to RTI and beyond.

Why RTI Permitting Often Becomes a Bottleneck

Getting to the RTI stage sounds straightforward—submit plans, get approvals, pay fees, and you’re done, right? Not always.

In Los Angeles, many projects stall just before RTI. The city’s process is layered, and even one small oversight can push timelines back by weeks—or even months. Let’s break down why RTI permitting often hits delays and what can be done about it.

Zoning and Land Use Complications

Zoning laws in LA are anything but simple. You may be dealing with:

  • Specific Plan Overlays (like Venice Coastal Zone or Hollywood Community Plan)

  • Transit Oriented Communities (TOC) incentives

  • Hillside or High Fire Severity Zones

  • SB 9 or ED1 eligibility rules

If your project doesn’t fully align with current zoning or needs a variance, you won’t get RTI until those issues are resolved.

Female architect engineer is drafting blueprints using CAD software, focusing on sustainable infrastructure, renewable energy solutions, and adhering to building codes

Uncoordinated City Departments

Each city agency operates independently. Planning may sign off, but Public Works might ask for a new sewer connection study. Or LADWP might delay electrical clearance.

At JDJ, we’ve seen too many projects delayed because no one was tracking all approvals. That’s why we offer full RTI management—our team follows up with every agency so nothing falls through the cracks.

Missing or Incorrect Documents

Even one unchecked box on an energy form or a missing geotechnical report can keep your permit from reaching RTI. City staff won’t issue a permit if even one document is outdated or missing.

We solve this with detailed pre-submittal checklists customized for each project type—so you’re not caught off guard late in the game.

Key Documents and Preparation for RTI Readiness

If you want to avoid delays and get your RTI status quickly, your best strategy is strong preparation. Having the right documents, plans, and authorizations from the start makes all the difference.

Here are the core documents required to reach RTI in Los Angeles:

Document TypeWhy It’s Needed
Full architectural and structural plansRequired for review by LADBS and other departments
Title 24 energy compliance formsRequired under California energy efficiency laws
Soils/geotechnical report (if applicable)Needed for hillside areas or multi-story structures
Green Building compliance formsRequired for most commercial and multifamily projects
Authorization to pull permitMust be signed by the property owner or licensed contractor
Permit application summaryLists scope, valuation, and project contact info
Zoning clearance or entitlement docsNeeded for TOC, ED1, or zone variance projects
Fire Department clearanceEssential for any multi-unit, commercial, or high-density housing
Sewer/utility clearancesFor new construction or projects impacting street infrastructure

Who Submits What?

The truth is—most property owners aren’t sure who’s responsible for each document. That’s where JDJ steps in. We coordinate directly with:

  • Architects

  • Civil and structural engineers

  • Energy consultants

  • Environmental teams

  • Utility providers

This saves time, reduces errors, and improves your odds of reaching RTI on the first review cycle.

Timeline and Costs Associated with RTI in Los Angeles

You’re probably wondering: How long does it take to get RTI status? And—how much will it cost?

The answers vary by project type, property location, and how well-prepared your team is. Below, we’ve outlined the average timelines and cost factors most developers face in Los Angeles.

General Timeline for RTI Status

Project TypeAverage Time to RTI
Single-family remodel (flat lot)2–4 months
New ADU (Accessory Dwelling Unit)3–5 months
Multifamily development (ED1/TOC)5–8 months or more
Hillside or fire zone projects6–12 months (depending on complexity)

Tip: Projects that qualify for ED1 fast-track or TOC incentives can see some timelines shortened—but only if your paperwork is airtight.

Breakdown of Typical RTI Costs

RTI permitting doesn’t come with a flat rate. It involves a combination of plan check fees, department review fees, inspection fees, and permit issuance charges.

Here’s a rough cost overview:

Fee TypeTypical Range (Low–High)
Plan check + permit fees$3,000–$20,000+ (based on valuation)
Fire Department review$300–$2,500
Soils/geotechnical report$2,000–$10,000+
Energy consultant (Title 24)$500–$1,200
JDJ RTI coordination serviceCustomized quote (based on scope)

Note: These are average ranges. JDJ provides upfront estimates so you’re never caught off guard.

How JDJ Consulting Group Supports RTI Permitting Projects

Getting RTI status isn’t just about submitting forms—it’s about knowing who to talk to, when to escalate, and how to stay on top of every moving piece. That’s where JDJ Consulting Group makes all the difference.

Whether you’re an investor, developer, or property owner, we help you save time, avoid mistakes, and get to the construction phase faster.

Here’s how we make that happen:

Initial Consultation and RTI Feasibility Assessment

Every project we take on begins with a strategy session. We look at your plans, location, and timeline, then flag potential roadblocks before you even submit to the city.

We answer questions like:

  • Is your project eligible for ED1 or TOC incentives?

  • Are you in a fire-prone or hillside zone?

  • Will you need a zoning variance or CEQA review?

  • Can parts of your plan qualify for express permitting?

From the start, we set clear expectations so you can make smart decisions and avoid wasted time.

Complete Document Preparation and Submittal Strategy

With JDJ, you’re not just getting a permit runner. You’re getting a team that prepares error-free, department-ready submittals.

Real estate inheritance concept and contract agreement.

We help coordinate:

  • Architectural, civil, and structural drawings

  • Energy and green building reports

  • Soil, sewer, and utility studies

  • Permit application forms and ownership authorizations

Once we review and assemble everything, we handle the submission—either electronically or in person—based on what your project needs.

Full Permit Tracking and Real-Time Communication with the City

After submission, we don’t just wait and hope. We actively track every department review and communicate with city agencies to keep things moving.

Our project managers monitor:

  • Plan check comments and correction notices

  • Departmental sign-offs and delays

  • LADBS fee summaries and payment schedules

If there’s a holdup—we find out why and fix it fast. And you get regular updates, so you’re never left wondering what’s happening.

RTI Permit Cost Estimator







RTI Permitting Los Angeles: Challenges and Smart Solutions

We’ve helped dozens of clients overcome RTI obstacles in Los Angeles. From entitlement delays to last-minute utility issues, JDJ steps in with practical solutions and insider knowledge.

Here are a few common problems—and how we solve them.

Problem: Delays Due to Environmental or Zoning Conflicts

Solution: Our team reviews zoning overlays, Specific Plans, and SB 9/ED1 eligibility early in the process. If your project needs a variance, we start entitlement filings while your plan check moves forward.

Problem: Multiple Agencies Requiring Simultaneous Approval

Solution: JDJ assigns a dedicated expeditor to your case who manages communication across LADBS, Planning, Fire, and Public Works. We don’t wait for reviews to get stuck—we follow up directly to avoid logjams.

Problem: Missing or Incorrect Forms Causing Rejection

Solution: We use pre-submittal checklists customized by project type—multifamily, ADU, mixed-use—so nothing falls through the cracks. Every plan set and form is double-checked before it hits LADBS.

Real Success Stories: How JDJ Got Projects to RTI Faster

We believe results speak louder than promises. Here are a few examples of how we helped real clients reach RTI—faster and with fewer setbacks.

32-Unit ED1 Project in South LA — RTI in 4.5 Months

This developer needed fast-tracked approval for an affordable housing project under Mayor Bass’s Executive Directive 1 (ED1).

Challenges:

  • Mixed-use zoning

  • Limited fire access

  • Expiring financing deadline

JDJ Strategy:

  • Engaged LADBS and Fire early

  • Handled full plan check coordination

  • Paid fees and completed clearances ahead of schedule

Outcome: RTI granted in 4.5 months, saving the project from a financing fallout.

Single-Family Remodel in Silver Lake — RTI with No Corrections

A homeowner came to us after a prior submittal was rejected three times. We started fresh with a clean application.

JDJ Approach:

  • Reviewed plans for code and zoning compliance

  • Added required green building documentation

  • Submitted via LADBS online portal with all clearances pre-approved

Outcome: Permit went RTI with zero plan check comments, and construction started two weeks later.

Conclusion: Why RTI Permitting in Los Angeles Requires Expert Support

In Los Angeles, permitting is more than a paperwork process—it’s a system built on layered reviews, complex zoning, and citywide initiatives like ED1 and TOC. That’s why reaching RTI status quickly and efficiently is so important.

At JDJ Consulting Group, we don’t just get your project to RTI—we keep it on track from start to finish. Our approach simplifies complex requirements, shortens timelines, and reduces project risk.

If you’re ready to move forward, don’t wait for delays to derail your plans.

Ready to Get RTI Faster? Contact JDJ Consulting Group Today

Let us help you take the next step. Schedule a free consultation and let our team evaluate your project’s permitting strategy. Whether you’re building new housing or remodeling a hillside home, JDJ can help you clear the city’s hurdles and start building sooner. Call our expert permit expeditor at (818) 233-0750 or contact us online to smoothen your permit approval process Los Angeles. 

1. Pre-Submittal Review 2. Plan Check by LADBS 3. Agency Clearances 4. RTI Permit Issued

Need Help Navigating the RTI Process?

JDJ Consulting Group streamlines permitting across Los Angeles. Let us handle the red tape while you build.

Request a Free Consultation

Frequently Asked Questions (FAQs) About RTI Permitting Los Angeles

What does RTI mean in Los Angeles permitting?

RTI stands for “Ready to Issue”, and it’s the final milestone in the plan check process with the City of Los Angeles. Once a permit reaches RTI status, it has passed all required departmental reviews, and fees have been paid. At this point, you’re cleared to pull the permit and start construction.

Key RTI highlights:

  • All clearances and corrections are complete.

  • You or your agent can now pull the permit.

  • No further plan modifications are needed.

How do I know if my permit is RTI?

To confirm your permit is RTI, you can check the status online using the LADBS Plan Check & Inspection System (PCIS). If it says “RTI” or “Ready to Issue,” all reviews and payments are done. JDJ clients also receive direct status updates.

Here’s how to verify RTI status:

  • Visit ladbs.org

  • Search for your project by address or PCIS number

  • Look for “Permit Status: Ready to Issue” or “RTI”

How long does it take to get RTI in Los Angeles?

RTI timelines vary depending on project type, zoning, and how well your documents are prepared. On average, a typical LA project can take anywhere from 3 to 9 months. Projects with complex zoning or entitlement issues may take longer.

Estimated RTI timelines:

  • Small remodels: 2–4 months

  • ADUs: 3–5 months

  • Multifamily new builds: 5–9+ months

  • Hillside or fire-prone zones: 6–12 months

What documents are required to reach RTI?

To reach RTI status, your submission must be complete, accurate, and cleared by all relevant departments. Missing documents are a major cause of delays.

You will likely need:

  • Full architectural and structural plans

  • Title 24 energy compliance reports

  • Soils/geotechnical report (for certain zones)

  • Green Building Code documentation

  • Owner or contractor authorization form

  • Zoning and fire department clearances

Who can pull the permit once a project is RTI?

After reaching RTI, only an authorized individual can pull the permit. This could be the property owner, a licensed contractor, or an authorized permit agent like JDJ Consulting.

Authorized parties include:

  • Licensed contractors with a valid CSLB number

  • Property owners acting as owner-builders

  • JDJ acting under signed authorization

Why do some projects get stuck before reaching RTI?

There are several common reasons projects stall before reaching RTI. These issues often come from poor coordination, incomplete documentation, or zoning conflicts. JDJ helps identify and fix these early.

Frequent RTI delays stem from:

  • Missing environmental or zoning documents

  • Incomplete fire or public works clearance

  • Errors in architectural or energy plans

  • Unpaid fees or incorrect valuation forms

Can JDJ Consulting help fast-track my RTI permit?

Yes, JDJ Consulting Group specializes in permit expediting and full RTI coordination in Los Angeles. Our team handles submittals, follow-ups, corrections, and communication with all city departments to help clients reach RTI faster.

Here’s how we help speed things up:

  • Pre-submittal document review

  • Departmental coordination (LADBS, Planning, Fire, etc.)

  • Regular status tracking and follow-up

  • One point of contact throughout the process

What happens after my project reaches RTI status?

Once your project is RTI, you’re almost ready to build. The next step is to pull the permit, schedule your inspections, and begin construction. JDJ also helps manage this phase to ensure a smooth transition.

After RTI:

  • Pay final fees (if not yet done)

  • Pull the permit from LADBS

  • Schedule required inspections

  • Begin construction activities

Does RTI status expire if I wait too long?

Yes, RTI status can expire if you don’t act in time. Typically, you must pull the permit within one year of reaching RTI. If you miss that window, the permit application may require updates or full resubmittal.

To stay on track:

  • Pull the permit as soon as possible

  • Avoid changes to the scope that might trigger re-review

  • Keep documents current if delays are unavoidable

Are RTI permits affected by zoning overlays like ED1 or TOC?

Definitely. Special overlays like Executive Directive 1 (ED1) and Transit Oriented Communities (TOC) often require additional documentation or entitlements. However, if managed correctly, they can also shorten RTI timelines.

Considerations for ED1/TOC:

  • Zoning and affordability documentation required

  • May qualify for streamlined review under housing initiatives

  • JDJ helps navigate both incentive and compliance requirements

How much does it cost to get to RTI in Los Angeles?

The cost of reaching RTI depends on your project’s size, type, and location. While every project is unique, you can expect to pay fees related to plan check, inspections, and city clearances.

Typical cost breakdown:

  • LADBS permit fees: $3,000–$20,000+

  • Consultant fees (energy, soils, green code): $1,000–$5,000+

  • Fire, zoning, and utility clearances: Varies by project

  • JDJ RTI coordination: Custom quote based on complexity

What makes JDJ Consulting different from other permit services?

Unlike basic permit runners, JDJ Consulting Group offers a full-service, hands-on RTI management experience. We focus on strategy, compliance, and communication—not just delivery.

What sets JDJ apart:

  • Dedicated project manager for each client

  • Weekly status updates and proactive troubleshooting

  • Relationships with LADBS and other key departments

  • Deep experience with zoning, entitlements, and housing policies

RTI Permitting Los Angeles Guide

Complete Guide to RTI Permitting in Los Angeles

From Plan Check to Ready-to-Issue Status

📋
1

Submit Complete Plans to LADBS

Digital submission through LADBS Plan Check system with all architectural and structural drawings.

2

Secure All Departmental Clearances

Obtain approvals from Zoning, Planning, Fire Marshal, and Public Works departments simultaneously.

3

Prepare Required Documentation

Submit Title 24 energy forms, soils reports, green building compliance, and authorization documents.

4

Pay All Final Permit Fees

Complete payment of permit fees, plan check fees, inspection fees, and outstanding city charges.

5

Navigate Zoning and Land Use Issues

Resolve TOC incentives, ED1 eligibility, variance requirements, and specific plan overlay complications.

6

Coordinate City Department Reviews

Manage simultaneous agency approvals and avoid delays from miscommunication between departments.