Title 24 California – Complete Guide for Builders, Designers & Land Use Consultants
If you’re starting a building or remodeling project in California, you’ll quickly hear about Title 24 California. This is the state’s Building Standards Code, and it forms the backbone of safe, efficient, and sustainable construction.
Title 24 isn’t just one rule. It’s a set of codes that work together. These codes cover structural design, plumbing, electrical systems, energy use, fire safety, and more.
Because technology and environmental priorities keep changing, the state updates Title 24 every three years. This keeps the rules in line with modern building methods and green practices.
Whether you’re adding an ADU or splitting a lot under SB 9, you’ll need to meet Title 24 standards before you can get your permit approved.
Title 24 Approval Process
Structure of Title 24 California
To better understand how Title 24 works, it helps to break it down into its 12 main parts. Each section covers a different aspect of construction and development.
Part Number | Name | What It Covers |
---|---|---|
Part 1 | Administrative Code | How building rules are applied and enforced |
Part 2 | Building Code | Structural safety and architectural standards |
Part 2.5 | Residential Code | Guidelines for houses and small buildings |
Part 3 | Electrical Code | Wiring, lighting, and electrical safety |
Part 4 | Mechanical Code | Heating, ventilation, and air conditioning systems |
Part 5 | Plumbing Code | Water supply, drainage, and waste systems |
Part 6 | Energy Code | Energy efficiency and conservation measures |
Part 8 | Historical Building Code | Special rules for historic structures |
Part 9 | Fire Code | Fire safety prevention and emergency planning |
Part 10 | Existing Building Code | Renovations, retrofits, and conversions |
Part 11 | CALGreen Code | Green building and sustainability standards |
Part 12 | Referenced Standards | Technical references and additional guidelines |
While every section is important, Part 6 — the Energy Code often receives the most attention from developers. This is because energy compliance can directly impact both project costs and approval timelines.
Deep Dive – Part 6 Energy Code
Among all sections, Part 6 plays a critical role in shaping how buildings in California use energy. This section is designed to reduce energy consumption, lower utility bills, and promote long-term sustainability.
There are two main compliance paths:
Prescriptive Method – Following set requirements for insulation, windows, HVAC systems, and lighting.
Performance Method – Using an energy model to prove that the building meets or exceeds energy efficiency targets.
Some of the most notable requirements in Part 6 include:
Minimum insulation ratings for walls, floors, and roofs.
High-performance windows that reduce heat transfer.
Mandatory use of LED lighting in most spaces.
Installation of high-efficiency heating and cooling systems.
Solar-ready roofing for new construction projects.
Because energy compliance is tied to your permit process, it is wise to address it early in project planning. At JDJ Consulting Group, we work closely with energy consultants and architects from the beginning. This proactive approach helps our clients avoid costly redesigns and keeps projects on schedule.
Part 11 – CALGreen Code
While the Energy Code focuses on reducing energy use, the CALGreen Code takes a broader view of sustainability. Introduced in 2010, CALGreen was the first mandatory green building code in the United States. It aims to improve public health, reduce environmental impact, and create more livable communities.
The CALGreen Code applies to new construction, major renovations, and certain tenant improvements. It covers topics such as water efficiency, indoor air quality, and recycling of construction waste. For developers in Los Angeles, these rules play an important role in project approvals, especially in communities with stricter environmental targets.
To make it easier to understand, CALGreen has two levels of compliance:
Compliance Type | What It Means | Examples of Requirements |
---|---|---|
Mandatory Measures | Rules you must follow for all applicable projects | Low-flow plumbing fixtures, waste diversion plans, pollutant control during construction |
Voluntary Measures | Optional standards that go beyond the minimum, often used for LEED points or marketing | Use of reclaimed water systems, advanced energy monitoring, higher recycled material content |
When working with JDJ Consulting Group, we help property owners decide which voluntary measures make sense for their budget and target market. Sometimes, a small upgrade in materials or water systems can result in long-term cost savings and faster sales or leases.
How Title 24 Affects Project Timelines and Permits in Los Angeles
Understanding Title 24 early can make or break your project schedule. In Los Angeles, meeting these requirements is not optional — it is a core part of the permit approval process.
When you submit building plans to the city, the plan checkers review them for Title 24 compliance. If anything is missing or incorrect, your application can be delayed. These delays often add weeks or even months to the timeline, especially if multiple revisions are needed.
Here’s a breakdown of how Title 24 requirements typically fit into the permitting stages:
Project Stage | Title 24 Impact | Possible Delays if Missed |
---|---|---|
Pre-Design | Energy and green building goals are set | Minimal if addressed early |
Plan Development | Energy calculations, CALGreen checklists, and compliance forms completed | 2–4 weeks if forms are incomplete |
Plan Check | City reviews Title 24 compliance | 4–8 weeks for revisions if errors are found |
Construction | On-site inspections for energy and green building measures | Work stoppage until corrections are made |
Involve an energy consultant early in the design phase.
Work with a zoning and permitting specialist to ensure all forms match city requirements.
Use pre-approved products and systems that already meet Title 24 standards.
At JDJ Consulting Group, we guide clients through each step, so they can move from design to construction with fewer surprises. This approach keeps projects on budget and on schedule, even in a strict regulatory environment like Los Angeles.
Common Challenges with Title 24 Compliance and How to Overcome Them
Even experienced developers in Los Angeles can run into hurdles when working with Title 24. The code changes every three years, so what was compliant last project may not work today. These shifting rules often lead to confusion, unexpected costs, and delays.
Quick Quiz: Title 24
What is the main goal of Title 24?
1. Frequent Code Updates
The California Energy Commission updates Title 24 regularly. Missing these changes can result in outdated designs. The best way to stay ahead is to partner with a consultant who tracks every update and interprets how it affects your specific project.
2. Complex Documentation
Title 24 compliance requires detailed forms, calculations, and sometimes modeling software. Small mistakes in these documents can trigger rejection from plan checkers. Using a professional drafting team that knows the paperwork inside out saves time.
3. Product and Material Delays
Certain high-performance products required by Title 24 may have longer lead times. Ordering them late can hold up inspections. Planning your procurement schedule early avoids costly last-minute scrambles.
4. Miscommunication Between Teams
Architects, engineers, and contractors must all be aligned on energy and green building requirements. If one team misses a detail, it can cause rework. Regular coordination meetings keep everyone on track.
Quick Tips to Stay Compliant Without Stress
Start compliance planning in the concept design phase, not after drawings are done.
Use pre-verified product lists to avoid approval issues.
Maintain open communication with all team members.
Consider voluntary upgrades to gain a market advantage.
At JDJ Consulting Group, we act as a bridge between your design, construction, and city approval teams. This proactive role helps clients avoid pitfalls and get projects approved faster.
Cost Implications of Title 24 Compliance in Los Angeles
Meeting Title 24 standards is not just about paperwork — it also has financial implications. While compliance can add to your upfront costs, it often saves money in the long run through lower energy bills and higher property value.
For Los Angeles projects, costs vary based on the building type, size, and scope of upgrades required. Here’s a general breakdown of where these expenses may come from:
Cost Category | Typical Range | Notes |
---|---|---|
Energy Compliance Reports (Residential) | $500 – $1,500 | Includes energy modeling and documentation |
Energy Compliance Reports (Commercial) | $1,000 – $3,500 | More complex modeling and calculations |
CALGreen Checklists and Forms | $250 – $750 | Often bundled with other compliance services |
High-Efficiency HVAC Systems | $5,000 – $20,000+ | Depending on size and technology |
Energy-Efficient Windows/Glazing | $8 – $25 per sq. ft. | Can add significant costs for large projects |
LED Lighting Systems | $300 – $2,500+ | Lower operating costs offset initial investment |
Consultant/Permit Coordination Fees | $1,000 – $5,000 | Helps avoid costly delays and rework |
Many developers see compliance costs as a burden, but they often lead to measurable returns:
Reduced utility bills due to better energy performance.
Higher resale or rental value because the building meets modern sustainability standards.
Faster city approval when working with consultants who know the system.
Potential rebates or incentives for exceeding Title 24 requirements.
At JDJ Consulting Group, we help clients identify where to invest for the best return while still meeting every requirement. This means your budget works harder for you — both during construction and long after the project is complete.
Inspection and Verification Requirements Under Title 24
Title 24 compliance doesn’t end when the design is approved — it continues through construction and final inspections. These inspections confirm that the building is built exactly as specified in the approved compliance documents.
When Inspections Happen
Inspections occur at multiple stages:
Rough construction phase – to verify insulation, duct sealing, and framing details.
Mid-construction – to check systems before they are concealed (like HVAC ducting).
Final inspection – to confirm all energy-efficient systems are installed and operational.
Key Verification Requirements
HERS (Home Energy Rating System) Testing – Required for certain mechanical systems such as HVAC, duct sealing, and ventilation.
Lighting Controls Testing – For nonresidential and some residential projects, especially those with advanced automation.
Envelope Inspections – Checking that walls, roofs, and windows match the approved U-factor and SHGC ratings.
Water System Efficiency Checks – Ensuring low-flow fixtures and systems meet CALGreen standards.
Tips for Smooth Inspections
Keep a copy of your approved Title 24 documentation on-site for reference.
Schedule inspections early to avoid delays during peak building seasons.
Use licensed subcontractors familiar with Title 24 to reduce rework.
Communicate regularly with the inspector to address issues immediately.
At JDJ Consulting Group, we coordinate directly with inspectors and testing agencies. This reduces the chance of last-minute surprises and helps you move from construction to occupancy without setbacks.
Title 24 Documentation Checklist for Los Angeles Projects
Organizing your Title 24 documents early is one of the best ways to keep your project on track. Missing paperwork is a common cause of permit delays in Los Angeles.
Below is a reference table showing the most common documents you’ll need for residential and commercial compliance:
Document Name | Purpose | Who Prepares It | When Needed |
---|---|---|---|
Title 24 Energy Compliance Report (CF-1R/NR-1) | Outlines how the building meets energy standards | Energy consultant | Permit application stage |
Certificate of Installation (CF-6R/NRCA) | Confirms systems were installed per approved plans | Licensed contractor | During construction |
HERS Verification Report | Independent testing of HVAC, duct sealing, etc. | HERS rater | Mid to final inspection |
Lighting Control Certification | Verifies proper installation of lighting controls | Lighting specialist or contractor | Before final inspection |
CALGreen Checklist | Confirms compliance with California Green Building Standards | Architect or consultant | Permit application stage |
As-Built Energy Model | Updated model reflecting actual construction | Energy consultant | At final inspection if changes occurred |
Prevents delays during plan check and inspections.
Ensures accuracy if changes occur during construction.
Keeps all stakeholders aligned — from architects to contractors.
JDJ Consulting Group specializes in preparing and managing these documents so that your compliance process runs smoothly from day one. With a clear plan, you can avoid the frustration of last-minute scrambling.
Common Mistakes in Title 24 Compliance and How to Avoid Them
Even experienced builders and architects can run into trouble with Title 24 if they overlook key requirements. Many of these mistakes lead to costly redesigns, inspection failures, or project delays.
1. Waiting Too Long to Involve an Energy Consultant
Delaying the energy review until after design completion often forces expensive changes.
Avoid it by: engaging an energy consultant early, preferably before submitting plans to the city.
2. Using Incorrect or Outdated Climate Zone Data
California has 16 climate zones, each with unique requirements. Using the wrong zone data results in plan check rejection.
Avoid it by: confirming the climate zone for your specific project site before starting calculations.
3. Overlooking HERS Testing Requirements
Some builders assume HERS testing is optional, only to discover it’s mandatory for HVAC, duct sealing, and ventilation systems.
Avoid it by: reviewing the compliance form’s “mandatory measures” section early in planning.
4. Inaccurate or Missing Documentation
Incomplete CF-1R, CF-6R, or NRCA forms cause immediate permit delays.
Avoid it by: maintaining a running checklist of required documents and who is responsible for preparing each.
5. Assuming Residential and Commercial Rules Are the Same
Title 24 has different standards for each occupancy type, and mixing them up can derail approvals.
Avoid it by: reviewing the specific part of Title 24 that applies to your building category.
By avoiding these pitfalls, you not only save time and money but also maintain credibility with building officials. At JDJ Consulting Group, we focus on early planning and document accuracy so you can pass inspections the first time.
Title 24 Energy Savings Estimator
Need Help with Title 24 Compliance?
Our consultants guide builders, designers, and land-use experts every step of the way.
📞 Contact Us TodayConclusion: Making Title 24 California Compliance a Smooth Process in Los Angeles
Title 24 compliance can feel complicated. California’s energy and green building rules change often. Detailed calculations, strict inspections, and many steps add pressure. Even small mistakes can cause costly delays.
The good news is that the process can be simple with the right plan. Start early. Work with experienced professionals. Keep your paperwork organized. These steps help you move forward with confidence.
At JDJ Consulting Group, we guide property owners, developers, and architects through every stage of Title 24. We make sure your project meets all energy standards. We help you pass inspections the first time and avoid delays.
Contact JDJ Consulting Group today
Let’s make your Title 24 process stress-free. Schedule your consultation now and get your project moving forward without compliance headaches. Call us at (818) 233-0750 or contact us online to schedule your free consultation with our expert team of land use consultants.
FAQs About Title 24 California
What is Title 24 in California?
Title 24 is California’s Building Standards Code. It sets rules for safe, efficient, and sustainable construction across the state. These regulations apply to new builds, remodels, and major renovations, ensuring structures meet high safety and environmental standards.
Covers building design, construction, and energy efficiency
Applies to residential, commercial, and mixed-use projects
Required for permit approval in California
How much is a Title 24 in California?
The cost depends on the size and complexity of your project. Residential documentation usually costs a few hundred dollars, while commercial projects can be higher due to complex energy modeling.
Residential: a few hundred to over $1,000
Commercial: higher due to detailed calculations
Hiring a consultant prevents costly re-submissions
What is Title 20 and Title 24 in California?
Title 20 and Title 24 work together to improve efficiency. Title 20 focuses on appliances, while Title 24 applies to building construction and design.
Title 20: appliance and fixture efficiency
Title 24: building and energy standards for structures
Both aim to reduce energy use statewide
Who enforces Title 24 in California?
Local building departments handle enforcement. They review your plans, check compliance reports, and inspect your project during construction.
In Los Angeles, enforced by the Department of Building and Safety
Plan review, documentation checks, and on-site inspections
Consultants help ensure quick approvals
When did Title 24 start in California?
California adopted Title 24 in 1978 to unify building and energy rules. The state updates it every three years to keep up with new technology and environmental goals.
First implemented in 1978
Updates every three years
Adapts to safety and sustainability needs
Does Title 24 require solar panels in California?
Yes—most new residential and certain commercial projects must include solar systems. Requirements vary by building type and location.
Solar PV required for most new homes
Some commercial projects included
Part of the energy code section of Title 24
Energy Use Before vs After Title 24
What is Title 20 California?
Title 20 sets efficiency standards for appliances, electronics, and plumbing fixtures sold in California. It works alongside Title 24 to reduce overall energy demand.
Regulates appliances and fixtures
Reduces water and power use
Complements Title 24 building standards
Does Title 24 apply to manufactured homes in California?
Yes—manufactured homes must meet certain Title 24 rules, along with federal HUD standards. Compliance depends on the scope of work.
Applies to manufactured housing
Also follows federal HUD rules
Requirements vary by project type
What is Title 24 air conditioning in California?
Title 24 sets energy efficiency and performance rules for HVAC systems. Air conditioners must meet minimum EER and SEER ratings for installation approval.
HVAC efficiency standards required
EER and SEER ratings enforced
Documentation and proper installation needed
Who pays for titles in California?
For Title 24 compliance, the project owner typically covers costs. This includes reports, calculations, and inspection fees.
Costs paid by project owner
Includes documentation and inspections
Consultants can reduce rework costs
What is the Title 24 Part 8 in California?
Part 8 is the Historical Building Code. It protects historic structures while keeping them safe and accessible.
Standards for preserving historic buildings
Balances safety with preservation
Applies to certified historic properties
What is CA Title 24 prescriptive method?
The prescriptive method is a checklist approach to compliance. If your project meets all listed requirements, it passes without detailed energy modeling.
Simplified compliance option
Uses fixed requirements like insulation and window ratings
Avoids complex performance simulations
How do I get Title 24 compliance in California?
To achieve Title 24 compliance, you must follow the state’s building and energy efficiency standards from the planning stage to final inspection. This involves working with certified professionals who can prepare the required calculations, submit compliance forms, and ensure construction meets code requirements.
Key steps include:
Hire a Title 24 consultant or certified energy analyst.
Complete compliance calculations and documentation before permit application.
Follow the approved plans during construction.
Schedule and pass all required inspections.
What happens if you fail Title 24 inspection?
Failing a Title 24 inspection can delay your project and add costs. The inspector will provide a list of deficiencies that must be corrected before work can continue or permits can be finalized.
Possible consequences include:
Delayed permit approval or project completion.
Additional labor and material costs for corrections.
Re-inspection fees.
Potential redesign if energy or safety standards aren’t met.
Is Title 24 required for home renovations?
Yes, Title 24 applies to most home renovations, especially if they involve structural changes, electrical work, HVAC upgrades, or additions that impact energy efficiency. Small repairs may not require compliance, but larger projects almost always do.
Common renovation triggers include:
Adding new rooms or converting spaces.
Installing new HVAC systems or lighting.
Major kitchen or bathroom remodels.
Upgrading insulation or windows.
What is the difference between Title 24 and LEED certification?
Title 24 is a California state-mandated building code focused on energy efficiency and safety. LEED is a voluntary, national certification for green building practices. While both aim to promote sustainable construction, Title 24 is legally required for applicable projects, whereas LEED is optional.
Main differences:
Title 24: State law, mandatory for permits.
LEED: Voluntary, nationwide recognition.
Title 24: Focus on meeting minimum code standards.
LEED: Focus on exceeding standards for environmental impact.
Can Title 24 be waived or exempted in California?
In most cases, Title 24 cannot be waived. However, certain projects, such as temporary structures or minor repairs, may be exempt. Local building departments can provide clarity on exemptions based on project type and scope.
Possible exemptions include:
Temporary construction or structures.
Minor alterations with no energy impact.
Some agricultural buildings.
Historic buildings with preservation constraints.
Who enforces Title 24 in California?
California Energy Commission writes and updates the rules.
City or county building departments review plans and inspect projects.
Permits are issued only after compliance is confirmed.
Title 24 is managed at two levels. The California Energy Commission sets the standards. Local building departments check plans and perform inspections. A permit is approved only when the project meets the California Energy Code.
What is the difference between Title 20 and Title 24 in California?
Title 20 sets appliance efficiency rules.
Title 24 covers building energy efficiency rules.
Title 20 regulates products, while Title 24 regulates buildings.
Title 20 and Title 24 both focus on saving energy. Title 20 applies to products like lighting, refrigerators, and water heaters. Title 24 applies to building design and construction. It reduces energy use and greenhouse gas emissions through better design and systems.
What does Title 24 mean in California?
Title 24 is the California Building Standards Code.
It includes the California Energy Code for energy rules in buildings.
It also covers safety, structure, and mechanical systems.
In California, Title 24 is the full building standards code. It contains the energy standards that control design, insulation, lighting, and mechanical systems. It also sets rules for safety, plumbing, and fire protection.
What triggers Title 24 compliance?
New building construction.
Large remodels that change energy systems or the building envelope.
Adding floor space to an existing building.
Replacing HVAC, lighting, or insulation.
Title 24 applies when you build, remodel, or upgrade systems that affect energy use. This includes new projects, major renovations, and building additions. Even replacing HVAC or upgrading insulation can require a Title 24 energy report.